BROOKLANDS NURSING HOME

SAUNDERSFOOT

Brooklands is a purpose built forty bedded nursing home that specializes in the care of the elderly with mental health problems. Also included is a five bedded, male only unit which caters for complex needs and challenging behaviour.   Their aim is to provide a home where people would want to live, and not just to stay.  A home where experienced caring  staff would ensure that all service users are safe and comfortable, and where they are treated with respect, dignity and in the way that staff would like to be treated themselves.

Mr Umanee called us in when one of the boilers in the main plant room started failing.

Following an inspection by Gas Technical Services it was noted that both boilers were in urgent need of replacement.  However, there is never a good time for a nursing home to be without hot water or heating and so it was up to Gas Technical Services to come up with an action plan that would enable the scheme to go ahead with the minimum of disruption.  Following further close consultation with Mr Umanee and Mr Mike Bridge it was found that not only were the boilers not providing enough heat but the home was regularly running out of hot water.  In addition there was a third boiler feeding hot water and heating to an annex and this boiler had been giving problems too.  Luckily, an external room had been created across a corridor from the original plant room, and it was here that the new boilers were going to be sited.  The old plant room was going to become a plant room purely for hot water generation, making two entirely separate systems.

The old plant room

The picture above shows the old plant room with 2 open flued boilers, both of which were obsolete, with a third one fitted in the annex.  hese two boilers not only provided heating for the main home, but fed the two hot water cylinder on the back wall.  Cold water was stored in a series of 10 large tanks in the loft, but the home had suffered from hot water air locking and running out.  Endless visits be endless different plumbers over the years had not helped the situation either.  The masses of pipework running through the loft all needed to be traced and its function determined before any work could start.

The New Heating System

For their reliability and performance we chose 3 No Vaillant EcoTec plus 637 system condensing boilers.

  

  

Fired up and ready to go!!!

Hot Water System

  

From this..................................................to this

Out went the old boilers and hot water cylinder along with plenty of redundant pipe work and a host of cold water storage tanks in the loft.  In went a Lochinvar LG75CE direct fired gas water heater coupled directly to the cold water mains and capable of producing 660 litres of hot water every hour at mains water pressure.

Both other phases have now been completed, with the Installation of a second Lochinvar water heater and the removal of three other boilers and the replacement of them with two high efficiency Vaillant EcoTec Condensing Boilers.

The final touches to the second Lochinvar Water Heater